Railways suspends Kalka -Shimla heritage line trains after ‘cracks’ on bridge: ‘What will happen during monsoon…’

Railways has suspended four out of seven trains while two trains were permitted to run till Taradevi and one till Kandaghat after cracks emerged on a railway bridge on Friday night.

Written By Fareha Naaz
First Published23 Jun 2024, 09:50 AM IST
The railway authorities suspended Kalka -Shimla heritage line trains after ‘cracks’ emerge on bridge on Friday night.
The railway authorities suspended Kalka -Shimla heritage line trains after ‘cracks’ emerge on bridge on Friday night.(AFP)

Cracks emerged on a railway bridge on Friday, June 21, night following which all trains on Kalka -Shimla heritage line were suspended the following day.

" Yesterday some officers came and checked and found cracks on the railway bridge. We hope that govt tries to restore the track as soon as possible," ANI quoted Local Councillor Summer Hill Virender Thakur as saying.

Also Read | Himachal Pradesh: Four dead after bus falls into gorge in Shimla’s Jubbal

As a preventative measure, the authorities suspended train service on the Shimla-Kalka narrow gauge line beyond Taradevi on June 22. This development comes after a railway bridge was washed out during monsoon last year, officials informed PTI.

According to a railway official, four out of seven trains were suspended. He said, "Four out of seven trains have been suspended while two trains are running till Taradevi and one till Kandaghat", reported PTI.

Also Read | ’Cracks not on Atal Setu but on ...’ — MMRDA rejects Nana Patole’s claims

"We wonder what will happen during the upcoming monsoon season", said Shimla Hotel and Tourism Stakeholders Association President M K Seth amid the huge rush of tourists during the ongoing summer season.

The update about cracks on the railway bridge comes just a day after cracks on the ‘Atal Setu sea bridge’ surfaced. The authorities claimed that the cracks were not on the bridge but on the road leading from Ulwe in Navi Mumbai.

Also Read | Congress’ Nana Patole slams PM Modi, Amit Shah over cracks on Mumbai’s Atal Setu

Connecting south Mumbai with the satellite city of Navi Mumbai, the ‘Atal Bihari Vajpayee Sewri-Nhava Sheva Atal Setu’ is also known as the Mumbai Trans-Harbour Link (MTHL). It was inaugurated in January this year and was built at a cost of 17,840 crore. The 21.8 km long six-lane bridge was constructed by the ruling BJP in collaboration with the Mumbai Metropolitan Region Development Authority (MMRDA).

Also Read | Indian Railways conducts successful trial run on world’s highest railway bridge

MMRDA, in an official statement, said that there is no crack in the main part of Atal Setu Bridge. Asserting that the cracks are minor, the statement reads. “During the inspection on 20th June 2024 by the Operation and Maintenance Team of the project, minor cracks were noticed at three places on Ramp No. 5 asphalt from Ulwe towards Mumbai which require immediate repair. M/s Strabag, the contractor of Package 4 of the Atal Setu project, has started the repair work in the said area and the work will be completed within 24 hours without any disruption to the traffic on the bridge.”

(With agency inputs)

Catch all the Business News, Market News, Breaking News Events and Latest News Updates on Live Mint. Download The Mint News App to get Daily Market Updates.MoreLess
First Published:23 Jun 2024, 09:50 AM IST
HomeNewsRailways suspends Kalka -Shimla heritage line trains after ‘cracks’ on bridge: ‘What will happen during monsoon…’

Most Active Stocks

Bharat Electronics

324.00
03:59 PM | 5 JUL 2024
6.65 (2.1%)

Oil & Natural Gas Corporation

288.20
03:59 PM | 5 JUL 2024
11.15 (4.02%)

Tata Steel

174.75
03:58 PM | 5 JUL 2024
-1.5 (-0.85%)

HDFC Bank

1,648.10
03:55 PM | 5 JUL 2024
-78.5 (-4.55%)
More Active Stocks

Market Snapshot

  • Top Gainers
  • Top Losers
  • 52 Week High

Raymond

3,226.70
03:55 PM | 5 JUL 2024
284.8 (9.68%)

B E M L

5,066.20
03:54 PM | 5 JUL 2024
412.35 (8.86%)

HBL Power Systems

569.80
03:59 PM | 5 JUL 2024
39.9 (7.53%)

The New India Assurance Company

273.75
03:56 PM | 5 JUL 2024
17.85 (6.98%)
More from Top Gainers

Recommended For You

    More Recommendations

    Gold Prices

    • 24K
    • 22K
    Bangalore
    74,093.000.00
    Chennai
    74,747.000.00
    Delhi
    74,964.000.00
    Kolkata
    75,037.000.00

    Fuel Price

    • Petrol
    • Diesel
    Bangalore
    102.86/L0.00
    Chennai
    100.75/L0.00
    Kolkata
    104.95/L0.00
    New Delhi
    94.72/L0.00
    OPEN IN APP
    HomeMarketsPremiumInstant LoanMint Shorts